Hydraulic Installation
Contained fuel tanker parking area Supply and install two prefabricated steel trays to be used as compliant contained fuel parking bays.
Source two 42’X 13’X 9’trays with drive in/back out ramps with trilinear walls and access ramps (drive in-back out)
Level installation site and place trays. The exact location is to be discussed with Defence stakeholders during the mobilization period.
Supply and install plumbing between the trays
Supply and install hydrocarbon filtering devices on all tray outlets. Truck Wash Bays EquipmentSupply and install high pressure cleaning equipment and water filtration and re-use for two existing wash bays.
Supply and install commercial grade high pressure equipment
Supply and install water filtration and re-use sytem.
