Electrical Works
Installation of underground electrical network to Cadet Training Centre
The electrical services described in this manual have been completed with the following systems and services: Demolition of the existing overhead electrical network, inclusive of Main Switchboard and two (2) main distribution boards; Provision and installation of one (1) new Main Distribution Board; Provision and installation of twenty (20) Defence certified electrical pull-through pits; Provision and installation of underground conduit and LV electric cable to all building entry points; Provision and installation of underground conduit and cable to all light poles; Provision and installation of underground conduit and network cable from MDF to all building entry points; Provision of testing and commissioning associated with the above systems; Provision of maintenance and servicing during the defect period (52 weeks from date of completion).