  1. HERITAGE WORKS FORT QUEENSCLIFF

    Department of Defence
    Queenscliff, VIC

    Building maintenance works on building 39 (drill hall) at the Fort Queenscliff Base.

  2. RAAF EDINBURGH (AIR COMFORT)

    Department of Defence
    Edinburgh, SA

    Edinburgh Defence Precinct DSTG -Computer Room Air-Conditioning Upgrade

  3. CABINETRY AACAP 16

    Army Aboriginal Community Assistance Program
    Laura, QLD

    The manufacture and delivery of Cabinetry and associated materials for the Multipurpose Facility (MPF) to service the Laura community.

  4. ARMY TRADE TRAINING AACAP 2016

    Army Aboriginal Community Assistance Program
    Laura, QLD

    Supply, delivery and application of Plaster for use in AACAP Laura Multipurpose Training Facility

  5. 16TH AIR GROUND REGIMENT WOODSIDE FUEL TANKER & WASHBAY UPGRADE

    Department of Defence
    Woodside, SA

    Supply and install two prefabricated contained fuel tanker parking steel trays. Supply and install high pressure washing and water filtration and re-use equipment for two existing truck wash bays

  6. WOOMERA TOWNSHIP PERIMETER FENCING

    Department of Defence
    Woomera, SA

  7. MEMBRANE SYSTEMS DESIGN

    Department of Defence

  8. MELBOURNE BAND 1 OFFICE X2 (VIC)


    melbourne, VIC

  9. ELECTRICAL INFRASTRUCTURE REMEDIATION WOOMERA

    Department of Defence
    Woomera, SA

    Remediation of Electrical Infrastructureat EDP Woomera

  10. CAMPBELL COM CENTRE

    Department of Defence
    Swanbourne, WA

    Campbell & Irwin Barracks Community Centre Works.

  11. RCD PRIORITY 3 COMPLIANCE

    Department of Defence
    21 bases across South Australia

    Residual Current Device Priority 3 Compliance Work South Australia

  12. FIRE TRAIL REMEDIATION WORKS CULTANA TRAINING AREA

    Department of Defence
    Eyre Peninsula, SA

    Fire Trail Remediation Works Cultana Training Area.

  13. EARTHING STUDY COMPLIANCE WOOMERA

    Department of Defence
    Woomera, SA

    Earthing Study at RAAF Woomera Range Complex

  14. WANGARATTA (MUD) ELECTRICAL UPGRADE

    Department of Defence
    Wangaratta, VIC

    Electrical infrastructure upgrades to the electrical distribution network at the Wangaratta Bersheeba Site (Site).

  15. ALRM OFFICE FITOUT

    Office Fitout including demolition, rebuilding and extension works to the existing building.

  16. SIMPSON BARRACKS VAULT AND ARMOURY UPGRADE

    Department of Defence
    Yallambie, VIC

    Vault and Armoury Upgrades at Simpson Barracks Watsonia.

  17. CHILD CARE CENTRE, COOBER PEDY


    Coober Pedy, SA

    Building Works at Tjitji Tjapu Tjuta Child Care Centre, & Umoona Old Administration Building, Coober Pedy, SA

  18. HA COMPLIANCE WORKS RAAF EAST SALE

    Department of Defence
    East Sale, VIC

    Hazardous Area Compliance Works RAAF East Sale, VIC

  19. HA COMPLIANCE WORKS PUCKAPUNYAL

    Department of Defence
    Puckapunyal, VIC

    Hazardous Area Compliance Works Puckapunyal Military Area, VIC

  20. HA COMPLIANCE WORKS HMAS CERBERUS

    Department of Defence
    Crib Point, VIC

    Hazardous Area Compliance Works HMAS Cerberus, VIC

  21. AACAP JIGALONG 2019

    Army Aboriginal Community Assistance Program
    Jigalong, WA

    Design and Construction of a Community Youth Centre, and Design the creek crossings on Jigalong Mission Road; Design shaded local park area; and Design public amenities building in Jigalong, WA

  22. PACM ELECTRICAL AIR COMFORT SERVICES WILLIAMSTOWN


    Williamstown, SA

  23. PACM ELECTRICAL AIR COMFORT SERVICES CANBERRA


    Canberra, ACT

  24. UMOONA – TOWN HOUSES


    Coober Pedy, SA

  25. LOCAL EMERGENCY GENERATORS WOOMERA

    Department of Defence
    Woomera, SA

    Eldo Hotel and Building 620 LEG Installation.

  26. FIRE TRAIL REMEDIATION WORKS BUCKLAND AND STONY HEAD

    Department of Defence
    Buckland & Stony Head, TAS

    Manufacturing and installation of new fire trail signs including unexploded ordnance (UXO) clearing for Buckland Military Training Area and Stony Head Training Area in Tasmania.

  27. AUSTRALIAN TAX OFFICE MELBOURNE SUPPLEMENTARY AIR-CONDITIONING

    Australian Tax Office
    747 Collins st Docklands Melbourne, VIC

    Manage the Installation of a new supplementary air conditioning unit to a band 2 executive office, installation of new meeting table base & Supply of 6 new office chairs

  28. AUSTRALIAN TAX OFFICE PENRITH SUPPLEMENTARY AIR-CONDITIONING

    Australian Tax Office
    121 / 125 Henry st Penrith, NSW

    Currently ongoing, consult and advise remediation of several noisy supp air units with the expectation that there may be some new supp air units installed and some remedial works to reduce noise of existing HVAC system.

  29. AACAP- PORMPURAAW 2020

    Army Aboriginal Community Assistance Program
    Pormpuraaw, QLD

    The aim of AACAP is to improve infrastructure, health and living conditions within Pormpuraaw:

    Design and Construct an Independent Living Facility (ILF) for the elderly within the Pormpuraaw Community.

  30. AUSTRALIAN TAX OFFICE AMUNGULA SERVICE DESK RELOCATION

    Australian Tax Office
    26 Narellan st Canberra, ACT

    Design and installation / relocation of ATO Property Services Desk, this project was expedited in an exceptionally short timeframe as requested by ATO.

  31. AUSTRALIAN TAX OFFICE CHM & UMG COMPUTER ROOM REFRESH

    Australian Tax Office
    10 Banfield st Chermside Qld 4032 & 28 Macgregor st Upper Mt Gravatt 4122, QLD

    Consultancy services provided and an extensive report was undertaken on the problems with computer rooms to both sites.

  32. AUSTRALIAN TAX OFFICE MELBOURNE SHOPFRONT WORKS

    Australian Tax Office
    747 Docklands Melbourne, VIC

    Currently underway in development / approval phase, expectation that the plans developed and costed in SOR-018 Melbourne shopfront design will now be carried out.

  33. AUSTRALIAN TAX OFFICE AMUNGULA EXECUTIVE FLOOR 2019

    Australian Tax Office
    26 Narellan st Canberra, ACT

    Construction of 1x Band 1 Office, 13x workstation and a small Utility Bay within the Level 10 Executive area of the Canberra (Narellan St) building

  34. AUSTRALIAN TAX OFFICE BRISBANE REFRESH

    Australian Tax Office
    55 Elizabeth st. Brisbane, QLD

    Extensive design for new breakout area furniture & design of meeting room conversions.

  35. AUSTRALIAN TAX OFFICE ALBURY REFRESH

    Australian Tax Office
    520 Smollett st, NSW

    Provide extensive HVAC documentation for proposed HVAC Upgrade, design of new breakout area to 4 levels

  36. AUSTRALIAN SPACE AGENCY PROJECT MANAGEMENT

    Australian Space Agency
    Melbourne, VIC

  37. AUSTRALIAN TAX OFFICE ALBURY BLINDS

    Australian Tax Office
    520 Smollett St., Albury, NSW

    Manage the supply and installation of 200 Blinds to the North & West sides of the 6 story building

  38. DSTO EDINBURGH HV MAIN RING

    Department of Defence
    DSTO Edinburgh, SA

    Upgrade of electrical infrastructure to RAAF Edinburgh

    The project comprises internal HV electrical infrastructure upgrade works at the Defence Science and Technology (DST) Group facilities at Edinburgh.

    The upgrade comprises the following key components:

    • Replacement of segments of existing 11kV Ring Main No.1 due to the presently installed cable being undersized for the potential loading scenarios on this cable.
    • Upgrade of existing Transformer Substation T6 from 750kVA to 1,000kVA
    • Upgrade of existing Transformer Substation T7 from 1,000kVA to 2,000kV.

  39. RAAF WOOMERA CIVIL WORKS

    Department of Defence
    Woomera, SA

    Road upgrades and repairs to RAAF base and Woomera town

    The work under the Contract consists of:

    The scope of works includes residential and airside pavement remediation within the Woomera Base Areas and Woomera Village .

    1. Earthworks
    2. Pavement reconstruction
    3. Bituminous surfacing including spray seal and asphalt
    4. Minor stormwater culvert works
    5. Remediation and repair of existing culvert structures
    6. Kerb and gutter, spoon drain and crossover replacement
    7. Kerb patching
    8. Road grading

    Miscellaneous Works

    1. Kerb Patching and Drainage Structure Repair and Maintenance
      • Repair and maintenance works of structures including kerb patching and drainage culverts is to be undertaken as per the drawings. Minor and Major Crack Repair is to be undertaken as per the below methodology.
    2. Minor Crack Repair Specification
      • Grind along cracks, forming a minimum 3 x 3mm groove, and approximately 20-30mm either side to roughen surface.
      • Apply Fosroc Nitomortar AP paste (or approved equivalent), in accordance with the manufacturer’s instructions, to the formed grooves and approximately 20-30mm either side of the groove.
    3. Major Patch Repair Specification
      • Remove all loose and delaminated concrete.
      • Saw cut or cut back the extremities of the repair location to a minimum depth of at least of 10mm to avoid feathering and to provide square edge. Break out the repair area to a minimum depth of 5mm up to the sawn edge.
      • Where reinforcement is exposed, jack-hammer concrete behind the reinforcement to achieve 20mm gap at the back of the reinforcement. This is to provide full cover and bond between the reinforcement and the repair mortar.
      • Grit blast the exposed reinforcement to class 2.5.
      • Clean the surface again. Remove any dust or any contaminated material.
      • Prime concrete and reinforcement surface with Sika Top-110 EpoCem (or approved equivalent). To avoid secondary rusting, prime the reinforcement immediately after the grit blasting. If the reinforcement is already rusted, clean the reinforcement again by second (lighter) grit blasting and prime with 110 EpoCem.
      • After the primer becomes “tacky”, build–up the concrete wall with Sika MonoTop-615HB repair mortar. Use the repair mortar strictly in accordance with the manufacturer’s specifications. Note that the minimum applied
      • thickness of MonoTop-615HB is 10mm. If the thickness of the repair mortar is greater than 80mm, the repair mortar should be applied on layers not exceeding 80mm each.
      • The repaired mortar shall be cured for at least 72 hours after placement.
      • Coat the repair mortar with two coats of Sika Top -107 Seal. Extend coating 200mm minimum beyond the edges of the repair patch. This coat is to provide waterproof layer above the repair mortar which will allow the repair mortar to gain strength even when submerged. The minimum cure period for Sika Top-107 Seal is 72 hours.

    SUPPLY OF MATERIALS All materials shall be supplied by the Contractor.