PACM | Wangaratta (MUD) Electrical Upgrade
16035
page-template-default,page,page-id-16035,page-child,parent-pageid-16147,user-registration-page,ajax_fade,page_not_loaded,,qode-theme-ver-16.7,qode-theme-bridge,wpb-js-composer js-comp-ver-5.5.2,vc_responsive

Wangaratta (MUD) Electrical Upgrade

ATM ID SN11162

Electrical Works

Installation of underground electrical network to Cadet Training Centre

The electrical services described in this manual have been completed with the following systems and services: Demolition of the existing overhead electrical network, inclusive of Main Switchboard and two (2) main distribution boards; Provision and installation of one (1) new Main Distribution Board; Provision and installation of twenty (20) Defence certified electrical pull-through pits; Provision and installation of underground conduit and LV electric cable to all building entry points; Provision and installation of underground conduit and cable to all light poles; Provision and installation of underground conduit and network cable from MDF to all building entry points; Provision of testing and commissioning associated with the above systems; Provision of maintenance and servicing during the defect period (52 weeks from date of completion).